© Copyright 2021 Jiangsu Aceretech Machinery Co., Ltd. All rights reserved. 苏ICP备2022044748号-1 Designed by iwonder.cn
a. If we can fulfill your request and you interested in our products, you may pay a visit to the MAPA Machine site.
b. The meaning of visiting supplier, because seeing is believing, MAPA Machine with own manufacture and developed& research team, we can send you engineers and make sure you are after-sales service.
a. In order to ensure the accuracy of each part, we are equipped with a variety of professional processing equipment and we have accumulated professional processing methods over the past years.
b. Each component before assembly needs strict control by inspecting personnel.
c. Each assembly is in charge by a master who has working experience for more than 15 years
d. After all the equipment are completed, we will connect all the machines and run the full production line for at least 12 hours to ensure the stable running in customers' factory
a. After finish the production, we will debug the production line, take photos, videos and send them to customers via mail or instant tools
b. After the commissioning, we will package the equipment by the standard export package for shipment.
c. According to the customer's request, we can arrange our engineers to customers' factories to do the installation and training.
d. Engineers, sales managers, and after-sales service managers will form an after-sales team, online and offline, to follow the customers' project.
a. Lower investment cost for a high quality and durable machine;
b. Low energy consumption with high production output;
c. Overseas installation and training are available;
d. Machine warranty with spares in stocking and in-time delivery; e. Fast machine delivery and installation: MAPA produces on an average of 10 sets of plastic machines per month and can deliver the machine faster than most manufacturers.
e.The regular delivery time of an MAPA recycling machine is 60 days.